In Fall 2007 through Spring 2008 we remodeled the water porch on the pond, which is now finished. We busted out the bad and loose concrete and the first pour (Piqua Concrete) was for the retaining wall.
The second pour was for the porch piece.
For the third pour we did the walls that go beside the steps.
The fourth and final pour was for the steps!
And now it’s done!